eQuick
Energy-storage fast charging for electric two-wheelers
Project Equick · 2026
Energy-storage fast charging

Bringing China’s
electric two-wheelers worldwide

Overcoming charging barriers. Opening global markets.

Energy-storage fast chargingFlexible deploymentCross-brand compatibility

China leads in electric two-wheelers
Yet overseas growth remains stalled

China leads the electric two-wheeler market with affordable prices, reliable performance and a complete supply chain. Yet overseas sales remain limited. The problem is not the vehicle. It is charging it after purchase.

6–8hours

Charging takes too long

Conventional charging takes 6–8 hours and is inconvenient. Plug in before going out, and the battery may still not be full when you return.

Charging infrastructure gap

Charging is hard to access

Without charging at home, an outlet or a private parking space, buying an electric two-wheeler is difficult. This barrier excludes most potential riders.

Electric two-wheelers × charging infrastructureConcept illustration

A cycle that blocks progress

The problem has persisted for years because each obstacle reinforces the next.

Riders × stations
Riders do not buy electric two-wheelers
Nobody builds charging stations
Even fewer riders buy
Sales remain stalled

THE VISIBLE CYCLE

Riders do not buy electric two-wheelers
→ Nobody builds charging stations
→ Even fewer riders buy
→ Sales remain stalled

THE UNDERLYING PROBLEM

Nobody invests in a charging network without riders;
nobody buys a vehicle without a way to charge it.

Breaking the cycle means hassle-free charging for riders,
without adding costs for any party.

Riders need all three
Three non-negotiable requirements

Riders may not be experts, but they vote with their feet. Miss any one of these requirements and the solution will not work.

01
Vehicle price=Affordable

Keep vehicles affordable

Charging must not make an electric vehicle unaffordable.
As vehicle prices rise, customers become unwilling to buy.

02
Charging cost≤Refuelling

Keep charging affordable

If charging costs more than refuelling, riders will not use it.
Charging must be inexpensive and reasonably priced.

03
40minutes, approx.
Maximum acceptable wait

Keep waiting times short

Around 40 minutes is the limit of riders’ patience.
Beyond that, riders will not accept electric vehicles.

What manufacturers do best
Build good-value vehicles efficiently

The key to getting brands and manufacturers on board: do not make them change anything for charging.

01

No major increase in vehicle cost

A cost increase erodes price competitiveness and closes the door to this market.

✓
02

No changes to production

Fast- and slow-charging models should not require separate production lines, which would erode margins.

✓
03

No changes to vehicle design

Overseas certification is slow and expensive. A design change means starting again—an unaffordable burden.

✓
04

No need to operate charging networks

Their strength is making vehicles, not building charging stations. Let specialists handle charging.

✓

eQuick makes fast charging
as accessible as a public utility

Like a petrol station: charge wherever a station is available, regardless of vehicle or time.

Mobile energy-storage fast charging

No grid upgrades required. No application for high-capacity power lines is needed. Deploy flexibly wherever demand arises.

Cross-brand compatibility (EQ-Protocol)

Supports 48 / 60 / 72V, with support for battery-pack protocols across brands. One station serves the whole market.

No vehicle-side changes

Fast- and slow-charging models have the same structure. Manufacturers need no redesign, process changes or recertification.

Energy-storage fast-charging prototype · exterior view

One unit. Connecting both sides of charging.

Energy-storage fast charging makes station deployment more flexible.

See how the system connectsFrom stored energy to vehicle charging,
follow the path of energy.
eQuick · energy-storage fast charging
OUR SOLUTION

Mobile energy-storage fast charging

No grid upgrades or applications for high-capacity power lines are required. Flexible siting lets you deploy wherever demand arises.

EQ-Protocol
Mobile energy-storage fast charging
48V60V72V
Application concept
01 / 10

From a deadlock to a clear path

BEFORE · A DEADLOCKNOW · A CLEAR PATH
High prices and difficult charging deter riders
→
Affordable vehicles make riders willing to buy
Unprofitable stations attract no investment
→
With eQuick support, riders are willing to buy and brands and manufacturers can enter overseas markets
Poor user experience holds back sales
→
Convenient charging improves the experience and unlocks sales
eQuick is not about making vehicles faster,
it is about opening the road to global markets.

eQuick

Opening the road to global markets

ENERGY IN

Grid supply

Store energy first

Ready to demonstrate
ENERGY OUT

Electric two-wheeler charging

Deliver stored energy when needed

Illustrative battery status
eQuick Energy-storage fast charging
Concept illustration only; not measured charging time, efficiency or live equipment data.
01 / 03
Arrow keys to navigate · Click blank space to advance · F: fullscreen